Now that i am finally doing something worth creating a build thread about, here it is. The car is a 97 Sc2 purple with about 55-60k on a rebuilt motor. The frame has 160k on it.
Q&A Thread viewtopic.php?f=61&t=32985
Details....
Start Date: May 19,2008
End Date: By TOtD 2008
Budget: Under $1000 for phase one
Engine....
-1.9 ll0
-Cylinders O/B .020"
-Head decked .010"
-Waiting on confirmation of hyper pistons from the rebuild
-stock rods
-stock cams
Adding with the build....
-Geo Storm TB
-91/92 Header
-Catch can
-Battery relocation to the trunk
Parts list....
-Eaton m62 Blower
-Custom built plenum
-Custom mounting brackets
-2.5" piping
-33lbs/hr injectors
-2 Bar map
-MegaSquirt 1 v2.2 controling fuel
-Boost gauge
-Pyrometer
-Oil Pressure gauge
-Wideband o2 gauge
-Custom 3.8", 10 psi pulley
That is what is going to be getting it running and tuned, also the end of phase 1. Once i have it set up and reliable, i will be adding the following which will most likely be after the dragon...
-2.75" Downpipe back exhaust including Cat
-Seting up MS to control fuel and spark
-FMIC and new piping
-SSQV
-Poly Suspension Bushings
-Prothane dog bones
-All aluminum rad (unless the stock cant keep it cool, then this will be part of phase one)
thats all for now....
Q&A Thread viewtopic.php?f=61&t=32985
Details....
Start Date: May 19,2008
End Date: By TOtD 2008
Budget: Under $1000 for phase one
Engine....
-1.9 ll0
-Cylinders O/B .020"
-Head decked .010"
-Waiting on confirmation of hyper pistons from the rebuild
-stock rods
-stock cams
Adding with the build....
-Geo Storm TB
-91/92 Header
-Catch can
-Battery relocation to the trunk
Parts list....
-Eaton m62 Blower
-Custom built plenum
-Custom mounting brackets
-2.5" piping
-33lbs/hr injectors
-2 Bar map
-MegaSquirt 1 v2.2 controling fuel
-Boost gauge
-Pyrometer
-Oil Pressure gauge
-Wideband o2 gauge
-Custom 3.8", 10 psi pulley
That is what is going to be getting it running and tuned, also the end of phase 1. Once i have it set up and reliable, i will be adding the following which will most likely be after the dragon...
-2.75" Downpipe back exhaust including Cat
-Seting up MS to control fuel and spark
-FMIC and new piping
-SSQV
-Poly Suspension Bushings
-Prothane dog bones
-All aluminum rad (unless the stock cant keep it cool, then this will be part of phase one)
thats all for now....
Comment