I'm finally piecing together everything. many years on debating if i should or shouldn't fix the saturn up, but i decided why not. its an OK start but working at Coca Cola you have NO life unless the down season comes. 60-70hr weeks suck but the checks are good lol
XXR 525 Machine Finish with Red.......18x7.5
tires coming. 215/40/18 Hankook V12 Evo K110
KYB GR2 struts front and back
Eibach lowering springs
and Body Kit
more to come when i get time
XXR 525 Machine Finish with Red.......18x7.5
tires coming. 215/40/18 Hankook V12 Evo K110
KYB GR2 struts front and back
Eibach lowering springs
and Body Kit
more to come when i get time
Comment